Inspection workflow
Every shipment follows a documented sequence: raw material verification on arrival, pre-shipment laboratory analysis of each batch, and checks at container loading.
Incoming ingredients are checked against specification and documented before they enter the production stream.
Each batch is tested for moisture, ash, protein content, and granulometry before a shipment is released.
Loading is inspected for cleanliness, condition, and correct lot allocation before the container is sealed.
Export packaging
Ingredients are packed in multi-ply kraft bags with moisture barriers, selected to protect product during containerized ocean voyages.
Palletizing and container loading follow export standards that limit movement and condensation risk, so each shipment arrives in the condition it was tested.
Notifications